Pernille Daugaard

 

Tectonic Architecture Studio

A minor project at Architecture & Design, 1. master semester, September 2010.

Project brief
The project is concerned with the development and presentation of a tectonic design proposal for a new pedestrian bridge. The bridge has no defined location, but developed through the 3 phases.

My final model:

Phase 01 / Elements / 02.09.10 – 08.09.10
Key terms and investigation perspectives within the phase:
– Material properties
– Joints
– Geometry 

Exampels from the first phase:

Exampels of some of the details:

 

Phase 02 / Systems / 09.09.10 – 15.09.10
Key terms and investigation perspectives within the phase:
– Assembly of elements
– Additive
– Alterations

Phase 03 / Formations / 16.09.10 – 23.09.10
Key terms and investigation perspectives within the phase:
– Holism
– Rhythm
– Expression
– Context

During the project I have filled out project catalogs:

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s